Federal Transit Administration PMO Services
As a member of the Project Management Oversight Contractor (PMOC) team for over $8.5 Billion in transit construction, JBC is responsible for scheduling oversight during the planning, preconstruction and construction phases of FTA funded projects to ensure successful completion and operation.
Weber County Commuter Rail and Mid-Jordan Light Rail, Salt Lake City, Utah, Utah Transit Authority (UTA). These $611 million and $535 million projects respectively include a new 44 mile commuter rail line with eight (8) new stations and a new 10.6 mile light rail with nine (9) new stations.
Tren Urbano, San Juan, Puerto Rico. Puerto Rico Highway and Transportation Authority. The $2.5 billion. multiple design/build heavy rail transit project consisted of a 10.5 mile fixed guideway, double track, dedicated right-of-way transit system and includes the construction of 16 stations and a maintenance facility.
South Boston Piers Transitway Project, Boston, MA, Massachusetts Bay Transportation Authority (MBTA). The $600 million project is a 1.5 mile underground transit tunnel combined with surface bus operations, which link the South Boston area with downtown Boston.